- Knowledgebase
- Studio Guide
- List of OCL Methods
-
Glossary
-
XML / ISO 20022 Standard
-
ISO 20022 Messages
-
XML Schema
- Miscellaneous
- Attribute
- Closing Tag
- Comment
- Content
- Cvc-complex-type
- Cvc-elt
- Cvc-id
- Cvc-identity-constraint
- Cvc-minexclusive-valid
- Cvc-mininclusive-valid
- Cvc-type
- Cvc-totaldigits-valid
- Cvc-attribute
- Cvc-datatype-valid
- Maximum Length
- Cvc-enumeration-valid
- Cvc-fractiondigits-valid
- Cvc-length-valid
- Cvc-maxexclusive-valid
- Cvc-maxinclusive-valid
- Cvc-maxlength-valid
- Cvc-minlength-valid
- Cvc-pattern-valid
- Element Value
- Encoding
- Length
- Mandatory element
- Missing
- Missing Tag
- Missing Child Element
- MIXD
- Root
- Unsupported Characters
- UTF-8
- Value
- Wrong Declaration
-
EPC SEPA
-
CGI-MP
-
US ACH (Nacha)
-
SWIFT MT
-
Finvoice
-
Bank-Specific
-
XMLdation Service Guides
-
Studio Guide
-
Simulator
.plusDays() / .plusMonths / .plusYears()
Method adds as many of days or months or years as the integer in the parameter indicates.
Description of the method
Description: | .plus{Days|Months|Years}() method adds as many of days or months or years as the integer in the parameter indicates. |
Available for: | ISO Date, ISO Date Time |
Parameters: | integer |
Return type: | ISO Date, ISO Date Time |
Example
Context: | HeaderType1 |
OCL: | self.TimeStamp.plusDays(2) = self.Dt |
Description: | The example rule compares the date of <TimeStamp> plus 2 days to the date of <Dt>. If the date of <TimeStamp> after the additional days equals the date of <Dt>, true will be returned. This works in the same way with months and years. |
The XML snippet below would pass this check.
<Header>
<Dt>2018-05-30</Dt>
<TimeStamp>2018-05-28T12:17:50</TimeStamp>
</Header>
The other snippet below however would not pass this check.
<Header> |